logo
ProjectActive

Greater Accra Resilient and Integrated Development Project

One of 4,244 projects Taiyo tracks in Ghana.

Source: World Bank Group

The development objective of the Greater Accra Resilient and Integrated Development Project for Ghana is to improve flood risk management and solid waste management in the Odaw River Basin of the Greater Accra Region and improve access to basic infrastructure and services in the targeted communities within the Odaw River Basin. It has five components. First component, Climate Resilient Drainage an

Status
Prospective
Sector
Road, Water Supply and Storage, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government
Location
Ghana
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Greater Accra Resilient and Integrated Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Greater Accra Resilient and Integrated Development Project” is an infrastructure initiative in the Road sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Greater Accra Resilient and Integrated Development Project for Ghana is to improve flood risk management and solid waste management in the Odaw River Basin of the Greater Accra Region and improve access to basic infrastructure and services in the targeted communities within the Odaw River Basin. It has five components. First component, Climate Resilient Drainage and Flood Mitigation Measures is led by the Ministry of Works and Housing (MWH) and aims at developing sustainable capacity for flood risk management and mitigating the flood risk for a 10-year flood within the Odaw River Basin. It has two sub-components. (i) Structural measures to mitigate flood impacts in the Odaw River Basin; and (ii) Non-structural measures to improve flood warning and preparedness; Second component, Solid Waste Management Capacity Improvements is led by the Ministry of Sanitation and Water Resources (MSWR) and aims at reducing the amount of solid waste flowing into the primary Odaw channel; It has four sub-component. (i) Community-based solid waste management interventions and community campaign; (ii) Waste transfer stations, materials recovery facility, and center of excellence for solid waste management; (iii) Capping of old dump sites; and (iv) Extending final disposal capacity for the Greater Accra Region; Third component, Participatory Upgrading of Targeted Flood Prone Low-Income Communities and Local Government Support is jointly led by the Ministry of Inner-Cities and Zongo Development (MICZD), Ministry of Local Government and Rural Development (MLGRD) and participating local governments to (a) reduce vulnerability and strengthen climate resilience to flooding and enhance public service provision in priority low-income communities and (b) improve metropolitan planning and coordination, as well as O&M of drainage infrastructure in the Odaw River Basin; It has three sub-component.(i) Participatory community upgrading; (ii) Community engagement and technical advisory services; and (iii) Metropolitan Governance and Operation and Maintenance Improvements; Fourth component, Project Management supports project management activities of the implementing entities and preparatory studies for the subsequent phases of the Series of Projects (SOP); Fifth component, Contingent Emergency Response Component (CERC) will be included in accordance with World Bank Policy on Investment Project Financing. The CERC will enable rapid reallocation of funding between project components following an emergency. By integrating a CERC into this project, the level of disaster preparedness is strengthened, eliminating the need for time-consuming restructuring in the immediate aftermath of a crisis, when the Government is in urgent need of quick liquidity.

Original sector

FY17 - Public Administration,FY17 - Social Protection,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Ghana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project