GREATER BAKU WATER SUPPLY REHABILITATION PROJECT
Sector: Water Supply and Storage • Location: Azerbaijan
Source: World Bank Group
The primary objectives of the Greater Baku Water Supply Rehabilitation Project are to: 1) make emergency short term improvements in the water supply system to restore the water supply to Baku, in particular to the poorer elements of the population; 2) improve the water supply system as a whole; and 3) provide the basis for longer term planning and recovery. The project will comprise five major com
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The primary objectives of the Greater Baku Water Supply Rehabilitation Project are to: 1) make emergency short term improvements in the water supply system to restore the water supply to Baku, in particular to the poorer elements of the population; 2) improve the water supply system as a whole; and 3) provide the basis for longer term planning and recovery. The project will comprise five major components: 1) water demand management to conserve water at the household level through a program of consumer awareness initiatives, through repairs to in-home plumbing, valves, taps and other fittings, and by rationalizing water use through meter installations and the implementation of a progressive water tariff; 2) operations and maintenance improvements to increase the amount of water available from the distribution system through a program of leak detection and repair, workshop and equipment acquisition, and at least a one year inventory of selected replacement valves and pipes; 3) supply improvements to improve the quantity and quality of water from the treatment works and enhancing the reliability of the distribution network ; 4) institutional capacity building to reorganize the water utility into a joint stock company; consolidating its offices; purchasing and installing new computers with new software; and developing training programs; and 5) preparation and implementation of a national policy framework for the water sector and preparing a regional master plan. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
