logo

Greater Cairo Air Pollution Management and Climate Change Project

Sector: Water Supply and Storage • Location: Egypt, Arab Republic of

Source: World Bank

Project
Active

The development objective of the Greater Cairo Air Pollution Management and Climate Change Project for Egypt is to reduce air and climate emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The project comprises of five components. The first component, enhancing the air quality management and response system consists of following sub-components: (i) reduction

Status
Prospective
Sector
Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Greater Cairo Air Pollution Management and Climate Change Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Greater Cairo Air Pollution Management and Climate Change Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Greater Cairo Air Pollution Management and Climate Change Project for Egypt is to reduce air and climate emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The project comprises of five components. The first component, enhancing the air quality management and response system consists of following sub-components: (i) reduction of air pollution and greenhouse gas (GHGs); and (ii) strengthening resilience to air pollution. The second component, support the operationalization of solid waste management (SWM) master plans in Greater Cairo consists of following sub-components: (i) waste management infrastructure; (ii) supporting response to Coronavirus 2019 (COVID-19) pandemic and improving healthcare waste management; and (iii) enabling activities, capacity building, and institutional strengthening. The third component, vehicle emission reduction consists of following sub-components: (i) electric bus fleet and related infrastructure; and (ii) enabling activities. The fourth component, enhanced capacity, behavioral change, and communication consists of following sub-components: (i) enhanced capacity and behavioral change; and (ii) communication and outreach. The fifth component, project management and monitoring and evaluation (M and E) will support strengthening the operational, fiduciary, and technical capacity of the project coordination unit (PCU) for implementation, coordination, supervision, and overall management of the project, including, procurement, financial management, M and E, carrying out of external audits, implementation of the stakeholder engagement plan (SEP), and reporting of project activities and results, all through the provision of goods, non-consulting services, consulting services, training, and operating costs for the purpose.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Egypt

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project