Greater Cairo Air Pollution Management and Climate Change Project
Sector: Water Supply and Storage • Location: Egypt, Arab Republic of
Source: World Bank
The development objective of the Greater Cairo Air Pollution Management and Climate Change Project for Egypt is to reduce air and climate emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The project comprises of five components. The first component, enhancing the air quality management and response system consists of following sub-components: (i) reduction
- Status
- Prospective
- Sector
- Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Greater Cairo Air Pollution Management and Climate Change Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Greater Cairo Air Pollution Management and Climate Change Project for Egypt is to reduce air and climate emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The project comprises of five components. The first component, enhancing the air quality management and response system consists of following sub-components: (i) reduction of air pollution and greenhouse gas (GHGs); and (ii) strengthening resilience to air pollution. The second component, support the operationalization of solid waste management (SWM) master plans in Greater Cairo consists of following sub-components: (i) waste management infrastructure; (ii) supporting response to Coronavirus 2019 (COVID-19) pandemic and improving healthcare waste management; and (iii) enabling activities, capacity building, and institutional strengthening. The third component, vehicle emission reduction consists of following sub-components: (i) electric bus fleet and related infrastructure; and (ii) enabling activities. The fourth component, enhanced capacity, behavioral change, and communication consists of following sub-components: (i) enhanced capacity and behavioral change; and (ii) communication and outreach. The fifth component, project management and monitoring and evaluation (M and E) will support strengthening the operational, fiduciary, and technical capacity of the project coordination unit (PCU) for implementation, coordination, supervision, and overall management of the project, including, procurement, financial management, M and E, carrying out of external audits, implementation of the stakeholder engagement plan (SEP), and reporting of project activities and results, all through the provision of goods, non-consulting services, consulting services, training, and operating costs for the purpose. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Egypt |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
