logo

Greater Cairo Wastewater Project

Sector: Water Supply and Storage • Location: Egypt, Arab Rep.

Source: World Bank Group

Project
Concluded

In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and

Project Information FAQ

Project Information

4 Q
The project “Greater Cairo Wastewater Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Rep.. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and involved the construction of no less than 20 water treatment plants in and around Cairo. The management contract itself was valued at 3.7 million pound sterling (US$7 million), financed through British bilateral aid. Biwater/ECG was to be responsible for the three pumping stations serving the east bank section of the citywide scheme - Ameria, Khalag and Kossous, all built by UK/local teams, with British finance. These stations were designed to transfer about 30 cubic meters a second of effluent to treatment plants under construction northeast of the city. This was equivalent to the entire sewerage produced by London. The partners also implemented a computerized maintenance system and trained Egyptian staff to take over. The initial 2 year contract was extended for 18 months until February 1996. Following the conclusion of the management contract, Biwater was retained for additional two years to provide ongoing technical assistance. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data