logo

Greater Cairo Wastewater Project

Sector: Water Supply and Storage • Location: Egypt, Arab Rep.

Source: World Bank Group

Project
Concluded

In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Rail, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial)
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Greater Cairo Wastewater Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Greater Cairo Wastewater Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Rep.. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

concluded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and involved the construction of no less than 20 water treatment plants in and around Cairo. The management contract itself was valued at 3.7 million pound sterling (US$7 million), financed through British bilateral aid. Biwater/ECG was to be responsible for the three pumping stations serving the east bank section of the citywide scheme - Ameria, Khalag and Kossous, all built by UK/local teams, with British finance. These stations were designed to transfer about 30 cubic meters a second of effluent to treatment plants under construction northeast of the city. This was equivalent to the entire sewerage produced by London. The partners also implemented a computerized maintenance system and trained Egyptian staff to take over. The initial 2 year contract was extended for 18 months until February 1996. Following the conclusion of the management contract, Biwater was retained for additional two years to provide ongoing technical assistance. None None

Original sector

Water and sewerage

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Rail, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial)

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project