Greater Cairo Wastewater Project
Sector: Water Supply and Storage • Location: Egypt, Arab Rep.
Source: World Bank Group
In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Rail, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Greater Cairo Wastewater Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 1992 a joint venture (exact shares unknown) between the U.K.’s Biwater and Engineering Consultants Group (ECG) of Egypt took over the management of Greater Cairo's new sewerage treatment plant and wastewater collection system after winning the four-year management contract in a competitive bid. The contract was designed to protect a US$3 billion capital investment that began in 1985 and involved the construction of no less than 20 water treatment plants in and around Cairo. The management contract itself was valued at 3.7 million pound sterling (US$7 million), financed through British bilateral aid. Biwater/ECG was to be responsible for the three pumping stations serving the east bank section of the citywide scheme - Ameria, Khalag and Kossous, all built by UK/local teams, with British finance. These stations were designed to transfer about 30 cubic meters a second of effluent to treatment plants under construction northeast of the city. This was equivalent to the entire sewerage produced by London. The partners also implemented a computerized maintenance system and trained Egyptian staff to take over. The initial 2 year contract was extended for 18 months until February 1996. Following the conclusion of the management contract, Biwater was retained for additional two years to provide ongoing technical assistance. None None |
Original sector | Water and sewerage |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Rail, Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
