Greater Sunrise Gas Development
One of 426 projects Taiyo tracks in Timor-Leste.
Source: TS2
A long-stalled gas development project in Timor-Leste with a study toward a 5 mtpa concept. The resource contains an estimated 5.1 trillion cubic feet of gas, with a first timeline publicly framed as 2032–2035.
- Status
- Prospective
- Sector
- Energy
- Location
- Timor Leste
- Updated
- 22 Jul 2026
- Source
- TS2
ConstructChat
Ask ConstructChat about Greater Sunrise Gas Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A long-stalled gas development project in Timor-Leste with a study toward a 5 mtpa concept. The resource contains an estimated 5.1 trillion cubic feet of gas, with a first timeline publicly framed as 2032–2035. |
Original sector | Energy |
Location
Country | Timor Leste |
Source
Source | TS2 |
URL |
More Details
Record type | Project |
Article published date | 2025-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
