Greater Tortue Ahmeyim LNG Project
Sector: LNG • Location: Mauritania
Source: Hydrocarbon Engineering
BP has begun flowing gas from wells at the GTA Phase 1 LNG project to its floating production storage and offloading (FPSO) vessel for the next stage of commissioning. This project is expected to produce around 2.3 million tpy of LNG and is a significant step for Mauritania and Senegal as gas-exporting nations.
- Status
- Under Construction
- Sector
- LNG
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- Hydrocarbon Engineering
ConstructChat
Ask ConstructChat about Greater Tortue Ahmeyim LNG Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BP has begun flowing gas from wells at the GTA Phase 1 LNG project to its floating production storage and offloading (FPSO) vessel for the next stage of commissioning. This project is expected to produce around 2.3 million tpy of LNG and is a significant step for Mauritania and Senegal as gas-exporting nations. |
Original sector | Energy |
Location
Country | Mauritania |
Source
Source | Hydrocarbon Engineering |
URL |
More Details
Record type | Project |
Sector | LNG |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
