Greefspan I Solar PV Plant

Sector: Power Generation (CCGT) • Location: South Africa

Source: World Bank Group

Project
Active

Geefspan solar PV was a 10 MW project to be located in the Northern Cape of South Africa. The project was sponsored by The Old Mutual Life Assurance Company of South Africa and local developer AE-AMD Renewable energy.

The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations o

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Commercial, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Greefspan I Solar PV Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Greefspan I Solar PV Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Geefspan solar PV was a 10 MW project to be located in the Northern Cape of South Africa. The project was sponsored by The Old Mutual Life Assurance Company of South Africa and local developer AE-AMD Renewable energy. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). Under bid rules, the project had to have at least 35% local content. There would be a 20 year PPA with the state owned utility, Eskom. In Novemebr 2012 the project reached fiancial close. The equity investors put in USD 14 million into the project, along with 34 million in debt financing. The debt was provided in local currency by the Development Bank of South Africa, Standard Bank and Future Growth Asset manager http://cdm.unfccc.int/filestorage/f/q/P0DS27MZI8K56AF3BNUXTCOGWYHVLE.pdf/CPA-DD.pdf?t=ZVp8bW00aWh2fDBrf-FFaGE0dP9AqgOX--gu

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Commercial, Government

Article published date

2024-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project