logo

Greek Street Bridge Replacement and Roundabout Reopening

The owner, status and timeline of this project. A free account opens every field.

Source: Secret Manchester

Project
Completed

Network Rail replaced the Greek Street bridge in Stockport, a key stop on the West Coast Main Line, in a £20 million scheme completed in summer 2025. The project involved removing 200 concrete beams from the previous 67-year-old structure and installing new bridge sections across a 60m gap above the tracks, with a concrete deck poured on top. The new structure is designed to last an estimated 120

Status
Closed
Sector
Cement, Mass Transit, Rail, Bridge, Power Transmission, Road, Power Generation (CCGT)
Location
Stockport, Greater Manchester, United Kingdom
Updated
22 Jul 2026
Source
Secret Manchester

ConstructChat

Ask ConstructChat about Greek Street Bridge Replacement and Roundabout Reopening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Greek Street Bridge Replacement and Roundabout Reopening” is an infrastructure initiative in the Cement sector, located in Stockport, Greater Manchester, United Kingdom. Taiyo aggregates data on it from Secret Manchester.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Network Rail replaced the Greek Street bridge in Stockport, a key stop on the West Coast Main Line, in a £20 million scheme completed in summer 2025. The project involved removing 200 concrete beams from the previous 67-year-old structure and installing new bridge sections across a 60m gap above the tracks, with a concrete deck poured on top. The new structure is designed to last an estimated 120 years and aims to keep trains moving safely while minimizing disruption to motorists. Following the bridge replacement, finishing works on the road and utility diversions were completed. The Greek Street roundabout, which sits atop the bridge, was closed for almost a year and is set to reopen on 27 March 2026.

Original sector

Transport

Budget

Location

Country

United Kingdom (UK)

State

Greater Manchester

City

Stockport

Source

Source

Secret Manchester

URL

More Details

Record type

Project

Sector

Cement, Mass Transit, Rail, Bridge, Power Transmission, Road, Power Generation (CCGT)

Article published date

2026-03-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project