Greeleyville STEAM Academy Addition & Renovations
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project is a 1 story 21,560 SF addition to Greeleyville STEAM Academy, 7 Varner Ave, Greeleyville, SC. The addition includes new classroom spaces, computer lab, STEAM lab, office space and kitchen/cafeteria area. Roof system shall be bar joist with 3 ply modified built up roof system. Flooring is LVP throughout except for restrooms and kitchen area which is poured epoxy flooring. Load bearing
- Status
- Closed
- Sector
- Raw Materials, Fertilizers, Commercial, Residential, Cement, Government, Manufacturing (Industrial)
- Location
- Greeleyville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Greeleyville STEAM Academy Addition & Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is a 1 story 21,560 SF addition to Greeleyville STEAM Academy, 7 Varner Ave, Greeleyville, SC. The addition includes new classroom spaces, computer lab, STEAM lab, office space and kitchen/cafeteria area. Roof system shall be bar joist with 3 ply modified built up roof system. Flooring is LVP throughout except for restrooms and kitchen area which is poured epoxy flooring. Load bearing masonry with brick veneer. Alternate pricing for new playground area and renovation of the existi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greeleyville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Fertilizers, Commercial, Residential, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
