logo

Green Ark / NU architectuuratelier + archipelago

Sector: Government • Location: Belgium

Source: ArchDaily

Project
Closed

Text description provided by the architects.Lying at the heart of the 92-hectareMeiseBotanic Garden, The Green Ark Project features the successful renovation of 7,600 m2 of greenhouse complex and the installation of a spectacular hyperboloid pavilion made with sustainable Kebony Clear wood housing more than 10,000 species of endangered plants across 22 different greenhouses, each independently reg

Project Information FAQ

Project Information

3 Q
The project “Green Ark / NU architectuuratelier + archipelago” is an infrastructure initiative in the Government sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.Lying at the heart of the 92-hectareMeiseBotanic Garden, The Green Ark Project features the successful renovation of 7,600 m2 of greenhouse complex and the installation of a spectacular hyperboloid pavilion made with sustainable Kebony Clear wood housing more than 10,000 species of endangered plants across 22 different greenhouses, each independently regulated to ensure optimal temperature and climate conditions for the diverse collection of flora. Amongst the pioneering new technologies installed at the Green Ark is an irrigation system that recycles the rainwater that falls onto the building, contributing to the reduction of energy consumption which has been halved in comparison to the old greenhouse facilities.The Green Ark will also act as a learning hub, educating theMeiseBotanic Garden’s 240,000 annual visitors about the ever-increasing threat that climate change poses to the planet’s biodiversity and the innovations to protect the environment for future generations.The fast-growing FSC-certified softwoods used by Kebony are specifically planted for this purpose and grow to the desired sixes in 25-30 years, while hardwoods can take 80-200 years to grow. During the growth of these trees, carbon is captured from the atmosphere, contributing to CO2 sequestration. The dual modification™ process permanently transforms the wood cell walls by forming locked-in furan polymers increasing the dimensional stability, durability, and hardness of the wood guaranteeing both long life and a high level of safety.The design and construction of the Green Ark is the result of a collaboration between various groups working in alliance with theMeiseBotanic Garden and the Flemish Government, including De Keyser Wood Industry, NU Architectuur Atelier, Archipelago Architects, Mouton and Van Poppel. Dually modified™ Kebony wood shingles were sawn into the roof of the pavilion, providing a natural finish that places the Green Ark in harmony with its botanical surroundings and enriches the visitor experience, as well as supporting the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data