Green Central Safe Routes to School Improvements
Sector: Car parking • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
This project includes approximately 1.3 miles of pedestrian and bicycle-related improvements along East 34th Street between Clinton Avenue and South 10th Avenue, and South 10th Avenue from East 33 Street to East 28th Street. Construction scope includes modifying the existing roadway to add an on-street two-way protected bikeway, along with ADA improvements, traffic diverters, and utility modificat
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Green Central Safe Routes to School Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes approximately 1.3 miles of pedestrian and bicycle-related improvements along East 34th Street between Clinton Avenue and South 10th Avenue, and South 10th Avenue from East 33 Street to East 28th Street. Construction scope includes modifying the existing roadway to add an on-street two-way protected bikeway, along with ADA improvements, traffic diverters, and utility modifications necessary to accommodate the improvements. Signal replacement and intersection improvements ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
