logo
ProjectPlanned

Green Chile Pipeline Project

Sector: Natural Gas • Location: Santa Teresa, New Mexico, United States

Source: KDBC

The Green Chile Pipeline Project is a proposed 17.7-mile, 24-inch-diameter natural gas pipeline intended to supply fuel to the Project Jupiter data center's on-site power generation. The pipeline would serve only the Project Jupiter data center facility and is planned to be operational by August 15, 2026. The project includes on-site power generation with microgrids to avoid strain on the main pow

Status
Prospective
Sector
Natural Gas, Power Generation (CCGT), Data Center
Location
Santa Teresa, New Mexico, United States of America
Updated
22 Jul 2026
Source
KDBC

ConstructChat

Ask ConstructChat about Green Chile Pipeline Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Green Chile Pipeline Project” is an infrastructure initiative in the Natural Gas sector, located in Santa Teresa, New Mexico, United States. Taiyo aggregates data on it from KDBC.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Green Chile Pipeline Project is a proposed 17.7-mile, 24-inch-diameter natural gas pipeline intended to supply fuel to the Project Jupiter data center's on-site power generation. The pipeline would serve only the Project Jupiter data center facility and is planned to be operational by August 15, 2026. The project includes on-site power generation with microgrids to avoid strain on the main power grid. The pipeline application is under federal review with key decisions and public comment deadlines set for April 13, 2026.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

New Mexico

City

Santa Teresa

Source

Source

KDBC

URL

More Details

Record type

Project

Sector

Natural Gas, Power Generation (CCGT), Data Center

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project