Green Hydrogen Project
Sector: Solar • Location: Dubai, United Arab Emirates
Source: SolarQuarter
DEWA’s Green Hydrogen Project is the first of its kind in the MENA region, utilizing solar energy to produce, store, and convert hydrogen into electrical energy, with a production capacity of 20 kilograms of hydrogen per hour.
- Status
- Under Construction
- Sector
- Solar, Water Supply and Storage, Power Generation (CCGT), Residential, Hydrogen, Commercial, Government
- Location
- Dubai, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Green Hydrogen Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DEWA’s Green Hydrogen Project is the first of its kind in the MENA region, utilizing solar energy to produce, store, and convert hydrogen into electrical energy, with a production capacity of 20 kilograms of hydrogen per hour. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
State | Dubai |
City | Dubai |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Power Generation (CCGT), Residential, Hydrogen, Commercial, Government |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
