Green Infra (Satara) Wind Energy Limited 18MW
Sector: Wind • Location: India
Source: World Bank Group
Green Infra Limited (an IDFC Private Equity Company) entered into an agreement with Maharashtra Government to develop a 18MW wind farm located at Satara district, in the state of Maharashtra. Green Infra Wind Energy Limited (GIWEL), an SPV, would execute the project. The wind farm will involve the building of 12 Suzlon S82 make wind turbines of 1.5MW capacity each. The electricity generated from t
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Green Infra (Satara) Wind Energy Limited 18MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Green Infra Limited (an IDFC Private Equity Company) entered into an agreement with Maharashtra Government to develop a 18MW wind farm located at Satara district, in the state of Maharashtra. Green Infra Wind Energy Limited (GIWEL), an SPV, would execute the project. The wind farm will involve the building of 12 Suzlon S82 make wind turbines of 1.5MW capacity each. The electricity generated from the project would be evacuated by the Maharashtra state grid. The delivery of the power plant would be done by Suzlon Limited. Power evacuation would be done by 43 km 220 kV transmission line and the 200 MVA substation, which are a part of the project. Green Infra Wind Energy Limited (Satara) would sell the power to Maharashtra State Electricity Distribution Company Ltd (MSEDCL) through a 13-year PPA.The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by Green Infra to the state transmission utility.The total capacity of 18MW was eligible under REC as per the CERC and CDM benefits under UNFCC. Contracts for supply, erection and O&M had been executed with Suzlon for this project. Financial closure took place in January 2012.The total project cost at the time of financial closure was US$ 21.4mn (INR 1146mn @ 53.44 INR/uSD).The debt equity ratio for the project was about 72/28. Financing comprised of a 15-year term loan of USD 15.5mn (INR 830mn) and sponsor equity of US$ 5.9mn (INR 316mn). The term loan had a repayment schedule of 52 quarterly instalments. The term loan was arranged by IDFC. Construction for the wind farm started in October 2011 and was expected to be completed by December 2012. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in India
- Mundra Power Plant Gujarat
- Vallur Conventional 1000MW Thermal Power Plant India
- Tapovan Vishnugad Hydroelectric Power Plant Uttarakhand
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Tamil Nadu Wind Farm
- Tiroda Super Critical Thermal Power Plant Maharashtra
- Polavaram Hydro Electric Project Andhra Pradesh
- East Coast Energy Private Limited (ECEPL)