logo

Green Infra (Theni) Wind Energy Limited 25.5MW

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank Group

Project
Active

Green Infra Limited (an IDFC Private Equity Company) entered into an agreement with Maharashtra Government to develop a 25.5MW wind farm located at Rasingapuram,Theni district, in the state of Tamilnadu. Green Infra Wind Energy Limited (GIWEL), an SPV, would execute the project. The wind farm will involve the building of 17 Regen Vensys V82 make wind turbines of 1.5MW capacity each. The electrici

Status
Prospective
Sector
Commercial, Wind, Government, Power Generation (CCGT), Raw Materials
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Green Infra (Theni) Wind Energy Limited 25.5MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Green Infra (Theni) Wind Energy Limited 25.5MW” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Green Infra Limited (an IDFC Private Equity Company) entered into an agreement with Maharashtra Government to develop a 25.5MW wind farm located at Rasingapuram,Theni district, in the state of Tamilnadu. Green Infra Wind Energy Limited (GIWEL), an SPV, would execute the project. The wind farm will involve the building of 17 Regen Vensys V82 make wind turbines of 1.5MW capacity each. The electricity generated from the project would be evacuated by the Tamilnadu state grid. The delivery of the power plant would be done by ReGen Powertech. Power evacuation would be done by 43 km 220 kV transmission line and the 200 MVA substation. Green Infra Wind Energy Limited (Theni) would sell the power to Tamilnadu State Electricity Distribution Company Ltd (TNEDCL) through a PPA. APPC (Average Power Purchase Cost) 20-year base feed-in tariff as per TNRC (Tamil Nadu State Regulator) tariff order, was US$ 0.066/Unit (INR 3.51 per unit @ 53.44INR/USD). The transmission charges would be paid by Green Infra to the state transmission utility.The total capacity of 18MW was eligible under REC as per the CERC and CDM benefits under UNFCC. Contracts for supply, erection and O&M had been executed with ReGen Powertech for this project. Financial closure took place in October 2012.The total project cost at the time of financial closure was US$ 28.7mn (INR 1537mn @ 53.44 INR/uSD).The debt equity ratio for the project was about 64/36. Financing comprised of a 14-year term loan of USD 18.3mn (INR 980mn) and sponsor equity of US$ 10.4mn (INR 557mn). The term loan had a repayment schedule of 52 quarterly instalments. The term loan was arranged by IDFC and other participating banks were State Bank of Mysore and United Bank of India. Construction for the wind farm started in October 2011 and was expected to be completed by December 2012.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Government, Power Generation (CCGT), Raw Materials

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project