Green Infrastructure Improvements at Mobile Downtown Airport
Sector: Government • Location: Mobile, Alabama, United States of America
Source: Dodge USA
The work includes constructing approximately 160 linear feet of a regenerative step pool conveyance system along the edge of airport property near the east side of Perimeter Road. In addition to restoration and stabilization the project will include selective clearing, grubbing, excavation, grading, installing stream level structures, installation and maintenance of erosion control, and emergent a
- Status
- Closed
- Sector
- Government, Airport, Commercial, Aerospace & Defense, Road, Manufacturing (Industrial)
- Location
- Mobile, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Green Infrastructure Improvements at Mobile Downtown Airport
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes constructing approximately 160 linear feet of a regenerative step pool conveyance system along the edge of airport property near the east side of Perimeter Road. In addition to restoration and stabilization the project will include selective clearing, grubbing, excavation, grading, installing stream level structures, installation and maintenance of erosion control, and emergent and riparian planting and landscaping. Stream level structures include rock j-hooks, riffle weirs,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Mobile |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Airport, Commercial, Aerospace & Defense, Road, Manufacturing (Industrial) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
