Green Infrastructure
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Clean Coast Collaborative to construct a rain garden in Robstown, Texas. Excavate existing lawn, install underdrain and connect to stormwater drain (involves some concrete work on the driveway), fill with filtration media, procure native plants (a local nursery has confirmed availability) and install according to plant design.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Cement
- Location
- Robstown, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Green Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clean Coast Collaborative to construct a rain garden in Robstown, Texas. Excavate existing lawn, install underdrain and connect to stormwater drain (involves some concrete work on the driveway), fill with filtration media, procure native plants (a local nursery has confirmed availability) and install according to plant design. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Robstown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Cement |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
