Green Line Train Protection System Project - C Branch Closure
Sector: Cable car • Location: Brookline, Massachusetts, USA
Source: WBUR
A 12-day partial closure of the Green Line's C branch in Brookline between Kenmore and Cleveland Circle to install new infrastructure as part of the Green Line Train Protection System project. The project aims to prevent trolley collisions and enforce speed limits by combining track-side and onboard technology, with full completion expected by 2028.
- Status
- Under Construction
- Sector
- Cable car, Rail, Automotive
- Location
- Brookline, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- WBUR
ConstructChat
Ask ConstructChat about Green Line Train Protection System Project - C Branch Closure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 12-day partial closure of the Green Line's C branch in Brookline between Kenmore and Cleveland Circle to install new infrastructure as part of the Green Line Train Protection System project. The project aims to prevent trolley collisions and enforce speed limits by combining track-side and onboard technology, with full completion expected by 2028. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brookline |
Source
Source | WBUR |
URL |
More Details
Record type | Project |
Sector | Cable car, Rail, Automotive |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
