Green Monster Project Phase 2 Drill Program
Planned · Nevada · Last reported Nov 2025
Source: Investing News Network
Glenstar Minerals Inc. has received a permit from the Bureau of Land Management to conduct the Phase 2 drill program at its Green Monster Project in southwestern Nevada. The program includes drilling nine holes over four locations, covering approximately 300 metres of strike length exploration. The precise drill hole locations will be determined based on the results of a recently completed geophys
- Status
- Prospective
- Sector
- Mining
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing News Network
ConstructChat
Ask ConstructChat about Green Monster Project Phase 2 Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Glenstar Minerals Inc. has received a permit from the Bureau of Land Management to conduct the Phase 2 drill program at its Green Monster Project in southwestern Nevada. The program includes drilling nine holes over four locations, covering approximately 300 metres of strike length exploration. The precise drill hole locations will be determined based on the results of a recently completed geophysical survey. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Investing News Network |
URL |
More Details
Record type | Project |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
