Green Monster Project Phase 2 Drill Program
Under construction · Nevada · Last reported Dec 2025
Source: TMX Newsfile
The Phase 2 drill program at the Green Monster Project in Nevada involves drilling nine holes over four targeted locations along 300 metres of strike length to explore mineralized zones identified in Phase 1. The program aims to further investigate high-grade zinc, silver, copper, nickel, and cobalt mineralization discovered in the initial drilling phase.
- Status
- Under Construction
- Sector
- Metal
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- TMX Newsfile
ConstructChat
Ask ConstructChat about Green Monster Project Phase 2 Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Phase 2 drill program at the Green Monster Project in Nevada involves drilling nine holes over four targeted locations along 300 metres of strike length to explore mineralized zones identified in Phase 1. The program aims to further investigate high-grade zinc, silver, copper, nickel, and cobalt mineralization discovered in the initial drilling phase. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | TMX Newsfile |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
