Green Point Green Infrastructure Improvements
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge USA
BEPA: IHD-GP-BK: The project design will incorporate green infrastructure to improve stormwater quality by reducing the load of sediment, pathogens, and other contaminants that are carried with runoff from adjacent streets and sidewalks.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Green Point Green Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BEPA: IHD-GP-BK: The project design will incorporate green infrastructure to improve stormwater quality by reducing the load of sediment, pathogens, and other contaminants that are carried with runoff from adjacent streets and sidewalks. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
