Green Tee I Lift Station
Sector: Water Supply and Storage • Location: Pearland, Texas, United States of America
Source: Dodge
The project is part of the program to rehabilitate or replace system-wide lift stations. The project will consist of evaluating the service area at this lift station to determine relocation, abandonment or a combination to move from the resident driveway potentially relocating it to the end of Donegal Road. This will include acquisition of a utility site, construction of a new wet well and top wit
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Green Tee I Lift Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is part of the program to rehabilitate or replace system-wide lift stations. The project will consist of evaluating the service area at this lift station to determine relocation, abandonment or a combination to move from the resident driveway potentially relocating it to the end of Donegal Road. This will include acquisition of a utility site, construction of a new wet well and top with hatch and fall protection, odor control, extending gravity lines to and from the current locati... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
