Green Valley Road Improvements
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The project consists of performing the following, including, but not limited to: Reconstruct pavement between Carey Ave and Thicket Lane; reconstruct concrete curb ramps and driveways; retrofit signal with APA (audible pedestrian signal) and countdown ped heads; restripe
- Status
- Prospective
- Sector
- Government, Cement, Commercial, Car parking, Road, Automotive
- Location
- Watsonville, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Green Valley Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of performing the following, including, but not limited to: Reconstruct pavement between Carey Ave and Thicket Lane; reconstruct concrete curb ramps and driveways; retrofit signal with APA (audible pedestrian signal) and countdown ped heads; restripe |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Watsonville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Car parking, Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
