Greenalia Tom Green Wind - 153 MW
Sector: Wind • Location: Texas, United States of America
Source: Dodge USA
Proposed 153 MW megawatt wind facility (may be from 153 to 200 MW). Power purchase agreement with Project Concha Direct Air Capture Hub project in Tom Green County, TX to power the project. To be completely wind-powered, with lower project cost than traditional DAC projects. Specific location and details to be announced.
- Status
- Prospective
- Sector
- Wind, Commercial, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Greenalia Tom Green Wind - 153 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed 153 MW megawatt wind facility (may be from 153 to 200 MW). Power purchase agreement with Project Concha Direct Air Capture Hub project in Tom Green County, TX to power the project. To be completely wind-powered, with lower project cost than traditional DAC projects. Specific location and details to be announced. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Commercial, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
