logo
ProjectPre-Design

Greenfield & Germann New Odor Control Construction

Pre-design · Arizona · Last reported Jul 2025

Source: Dodge

Design and construction of a new biological odor control system north of Greenfield Water Reclamation Plant (GWRP) to reduce hydrogen sulfide in the 48" gravity sewer lines along S Greenfield Rd and address ongoing odor complaint issues. The project will include a secured eight-foot block wall, site improvements, wastewater collection system tie-ins, biofilter, electrical controls, SCADA monitorin

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydrogen, Government, Commercial
Location
Gilbert, Arizona, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Greenfield & Germann New Odor Control Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Greenfield & Germann New Odor Control Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Gilbert, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Design and construction of a new biological odor control system north of Greenfield Water Reclamation Plant (GWRP) to reduce hydrogen sulfide in the 48" gravity sewer lines along S Greenfield Rd and address ongoing odor complaint issues. The project will include a secured eight-foot block wall, site improvements, wastewater collection system tie-ins, biofilter, electrical controls, SCADA monitoring system, and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Gilbert

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydrogen, Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project