Greenfield Road Resurfacing (Lincoln to 12 Mile)
Planned · Michigan · Last reported Apr 2026
Source: ClickOnDetroit | WDIV Local 4
Repair, rehabilitate and resurface Greenfield Road from Lincoln to 12 Mile in Southfield, Berkley and Oak Park by repairing the road base and adding 3 to 4 inches of new asphalt.
- Status
- Prospective
- Sector
- Road
- Location
- Southfield, Berkley and Oak Park, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- ClickOnDetroit | WDIV Local 4
ConstructChat
Ask ConstructChat about Greenfield Road Resurfacing (Lincoln to 12 Mile)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Repair, rehabilitate and resurface Greenfield Road from Lincoln to 12 Mile in Southfield, Berkley and Oak Park by repairing the road base and adding 3 to 4 inches of new asphalt. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Southfield, Berkley and Oak Park |
Source
Source | ClickOnDetroit | WDIV Local 4 |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
