GreenH Rogaland
Sector: Manufacturing (Industrial) • Location: Norway
Source: EU Funding & Tenders Portal
The RogalandH2 project will produce a total of 17.7 ktonnes of compressed Renewable Fuels of Non-Biological Origin (RFNBO) hydrogen over 10 years of operation, using water and renewable electricity. The project plans to install an electrolyser with a 12.5 MWe capacity. Over the first 10 years of operation, RogalandH2 will avoid 121 ktonnes of CO2 equivalent. The electricity required by the project
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Hydrogen, Seaport, Water Supply and Storage, Power Generation (CCGT)
- Location
- Norway
- Updated
- 19 Nov 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about GreenH Rogaland
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | forthcoming |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The RogalandH2 project will produce a total of 17.7 ktonnes of compressed Renewable Fuels of Non-Biological Origin (RFNBO) hydrogen over 10 years of operation, using water and renewable electricity. The project plans to install an electrolyser with a 12.5 MWe capacity. Over the first 10 years of operation, RogalandH2 will avoid 121 ktonnes of CO2 equivalent. The electricity required by the project will be sourced from the decarbonised Norwegian grid, with a historically consistent renewable share above 100 per cent. The plant intends to deploy a novel modular electrolyser technology that enables cost-effective production of RFNBO hydrogen at lower initial production volumes, while allowing capacity to scale in line with market uptake. The RogalandH2 project expands RFNBO hydrogen production and distribution along the coast of Norway, and will be supplied mainly to maritime off-takers. The need for transport will be minimized, enabling off-takers by bunkering hydrogen directly from the production site. The project, located in Risavika in Norway, significantly contributes to the European Union’s aim to decarbonise the maritime sector, contributing to ReFuelEU Maritime objectives, as well as contributing to the RePowerEU objectives to deploy domestic production of hydrogen in Europe. The project will benefit local economic value and industrial momentum in the region, creating an estimated 400 person-years during construction and 10 to 20 full-time jobs during operation. By sourcing the electrolyser and key components from European manufacturers, the project directly supports European industrial leadership in this strategic market, also in alignment with the Net Zero Industry Act ambitions. |
Location
Country | Norway |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Hydrogen, Seaport, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-10-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
