logo
ProjectConstruction

Greenhouse - Daniel J. Patterson Campus

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The NextGen Greenhouse will be built in the same location of the existing Teaching Greenhouse (At the Daniel J Patterson Campus in Niagara-on-the-Lake), reusing as much of the existing concrete pad as possible, with a slight expansion to the South, as to not impede on the Niagara Escarpment views from Benchmark restaurant. The approximate size of the new greenhouse space will be 21,500sq.ft. (20,0

Status
Under Construction
Sector
Education, Cement, Government, Commercial, Raw Materials
Location
Niagara-On-The-Lake, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Greenhouse - Daniel J. Patterson Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Greenhouse - Daniel J. Patterson Campus” is an infrastructure initiative in the Education sector, located in Niagara-On-The-Lake, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The NextGen Greenhouse will be built in the same location of the existing Teaching Greenhouse (At the Daniel J Patterson Campus in Niagara-on-the-Lake), reusing as much of the existing concrete pad as possible, with a slight expansion to the South, as to not impede on the Niagara Escarpment views from Benchmark restaurant. The approximate size of the new greenhouse space will be 21,500sq.ft. (20,000sq.ft greenhouse and 1,500sq.ft corridor), replacing the existing 16,000sq.ft. greenhouse space...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Niagara-On-The-Lake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Education, Cement, Government, Commercial, Raw Materials

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project