Greenko Energies Private Limited Sattenpalli and Kadapa Units
Active · India
Source: World Bank Group
Greenko Energies Private Limited was created to build and operate biomass power plants. It had two units: 6MW Sattenpalli Unit (KMS) and 6 MW Kadapa Unit (Sri Balaji).
Sattenpalli Unit was located at Sattenapalli mandal, Guntur district, Andhra Pradesh. The project became operational in July 2002 and was acquired by Greenko in January 2007. The plant used Rice Husk, GN Shell and Juliflora as the
- Status
- Prospective
- Sector
- Biomass, Commercial, Power Generation (CCGT), Warehouse, Consumer Products, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Greenko Energies Private Limited Sattenpalli and Kadapa Units
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Greenko Energies Private Limited was created to build and operate biomass power plants. It had two units: 6MW Sattenpalli Unit (KMS) and 6 MW Kadapa Unit (Sri Balaji). Sattenpalli Unit was located at Sattenapalli mandal, Guntur district, Andhra Pradesh. The project became operational in July 2002 and was acquired by Greenko in January 2007. The plant used Rice Husk, GN Shell and Juliflora as the major fuel. The project was registered under CDM. The project signed a 20 year PPA with APTRANSCO (state DISCOM). Total cost of setting up of the project was estimated at US$4.5 million. Kadapa Unit (Sri Balaji) was located at Chennur mandal, Kadapa district, Andhra Pradesh. The project became operational in April 2004 and was acquired by Greenko in August 2006. The plant used rice husk, ground nut shell and juliflora as the major fuel. The project was registered under CDM. The project signed a 20 year PPA with APTRANSCO (state DISCOM). Total cost of setting up of the project was estimated at US$4.5 million. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Power Generation (CCGT), Warehouse, Consumer Products, Government |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
