Greenko Patan Taluka Wind Farm
One of 10,000+ projects Taiyo tracks in India.
Source: World Bank Group
In June 2010, Greenko Group entered into an agreement with Maharashtra Government to develop a 65.6MW wind farm located at Patan Taluka of Satara district, in the state of Maharashtra. The project would be executed by Ratnagiri Wind Power Projects Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 41 WTGs (wind turbine generators) of 1600KW capacity each.
- Status
- Prospective
- Sector
- Commercial, Wind, Government, Power Generation (CCGT), Raw Materials
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Greenko Patan Taluka Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In June 2010, Greenko Group entered into an agreement with Maharashtra Government to develop a 65.6MW wind farm located at Patan Taluka of Satara district, in the state of Maharashtra. The project would be executed by Ratnagiri Wind Power Projects Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 41 WTGs (wind turbine generators) of 1600KW capacity each. The WTGs would be supplied by GE Energy India Limited. The farm was expected to have a load factor of 20.1%. The power generated by the project activity will be exported to NEWNE grid (220 KV substation will be connected to 400/220 KV RS station at Karad at approximately 12 kms away). The gross power generation from the project activity had been estimated to be 115,506 MWh annually. The Ratnagiri Wind farm was expected to sell the power to Maharashtra State Electricity Distribution Company Ltd (MSEDCL), although the details of PPA couldnot be confirmed at the time of collection of this information. The APPC (Average Power Purchase Cost) tariff as per MERC tariff order (dated 14 July 2010 for Wind zone 1) was US$ 0.108/Unit (INR 5.07 per unit @ 47INR/USD) for the first 13 years of operation. The total capacity of 65.6 MW was eligible for GBI (Generation Based Incentive) benefits and UNFCC had started the validation project for Certified Emission Reductions (CERs) since October 2010. The EPC contract was awarded in July 2010 and WTG supply contract awarded to GE in August 2010. Financial closure took place in July 2011.The total project cost was US$ 91.5mn (INR 4300mn @47 INR/USD).The debt equity ratio for the project was about 70/30. Financing comprised of a US$ 63.8mn (INR 3000mn) Term loan of 14years 1month and sponsor equity of US$ 27.6mn (INR 1300mn). The term loan was fully provided by IDFC and State Bank of India. Construction for the wind farm started in July 2010 and was expected to be commissioned by December 2011. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Government, Power Generation (CCGT), Raw Materials |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Mahan I Power Project Madhya Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Lower Subansiri Hydroelectric Power Project
- Agar Solar Park Madhya Pradesh
- Construction of the Aga Hall Estate, a high-rise residential project (2 towers of 45 and 56 stories) in Mumbai (India)