Greenlane Commercial EV Charging Station -Baker
Sector: Raw Materials • Location: Baker, California, United States of America
Source: Dodge USA
electric truck charging stop -. It will include 400 kW and 200 kW DC fast chargers covered by solar canopies. There will also be other charging options available for overnight and hotel charging for heavy-duty semi trucks, and charging ports for cars and light-duty trucks. The facility will have amenities such as restrooms and food and beverages. - detailed scope to be determine
- Status
- Prospective
- Sector
- Raw Materials, Hotel, Power Generation (CCGT), Solar, Electric Vehicles (EVs), Consumer Products, Seaport, Automotive, Commercial
- Location
- Baker, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Greenlane Commercial EV Charging Station -Baker
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | electric truck charging stop -. It will include 400 kW and 200 kW DC fast chargers covered by solar canopies. There will also be other charging options available for overnight and hotel charging for heavy-duty semi trucks, and charging ports for cars and light-duty trucks. The facility will have amenities such as restrooms and food and beverages. - detailed scope to be determine |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Baker |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Hotel, Power Generation (CCGT), Solar, Electric Vehicles (EVs), Consumer Products, Seaport, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
