logo
ProjectCompleted

Greenlink Interconnector

Sector: Power Generation (CCGT) • Location: Wexford, Ireland

Source: Portnews

The Greenlink Interconnector is a subsea cable that facilitates energy exchange between Ireland and Great Britain, optimizing distribution based on need. It has a capacity to power up to 380,000 households and effectively doubles the energy exchange capacity between the two regions, contributing to climate objectives by facilitating the import of lower carbon electricity.

Status
Closed
Sector
Power Generation (CCGT)
Location
Wexford, Ireland
Updated
22 Jul 2026
Source
Portnews

ConstructChat

Ask ConstructChat about Greenlink Interconnector

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Greenlink Interconnector” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Wexford, Ireland. Taiyo aggregates data on it from Portnews.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Greenlink Interconnector is a subsea cable that facilitates energy exchange between Ireland and Great Britain, optimizing distribution based on need. It has a capacity to power up to 380,000 households and effectively doubles the energy exchange capacity between the two regions, contributing to climate objectives by facilitating the import of lower carbon electricity.

Original sector

Energy

Location

Country

Ireland

City

Wexford

Source

Source

Portnews

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project