logo

Greenlink Nevada Transmission Project

Sector: Energy • Location: Nevada, United States

Source: Tahoe Daily Tribune

Project
Planned

The Greenlink Nevada transmission project is a renewable energy transmission line spanning from Las Vegas to Yerington, Nevada. It is expected to come online in spring 2027 and will allow Liberty Utilities to use NV Energy's transmission system to purchase and deliver its own energy independently.

Status
Prospective
Sector
Energy
Location
Nevada, United States of America
Updated
22 Jul 2026
Source
Tahoe Daily Tribune

ConstructChat

Ask ConstructChat about Greenlink Nevada Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Greenlink Nevada Transmission Project” is an infrastructure initiative in the Energy sector, located in Nevada, United States. Taiyo aggregates data on it from Tahoe Daily Tribune.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Greenlink Nevada transmission project is a renewable energy transmission line spanning from Las Vegas to Yerington, Nevada. It is expected to come online in spring 2027 and will allow Liberty Utilities to use NV Energy's transmission system to purchase and deliver its own energy independently.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

Source

Source

Tahoe Daily Tribune

URL

More Details

Record type

Project

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project