logo

Greenlink Transmission Network

Sector: Power Transmission • Location: Nevada, United States

Source: Quantisnow

Project
Under Construction

The Greenlink transmission network is a more than 700-mile transmission project in Nevada, currently being built under the tenure of Doug Cannon at NV Energy. It is Nevada's longest and largest transmission project.

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT)
Location
Nevada, United States of America
Updated
22 Jul 2026
Source
Quantisnow

ConstructChat

Ask ConstructChat about Greenlink Transmission Network

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Greenlink Transmission Network” is an infrastructure initiative in the Power Transmission sector, located in Nevada, United States. Taiyo aggregates data on it from Quantisnow.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Greenlink transmission network is a more than 700-mile transmission project in Nevada, currently being built under the tenure of Doug Cannon at NV Energy. It is Nevada's longest and largest transmission project.

Original sector

Utilities

Location

Country

United States of America (USA)

State

Nevada

Source

Source

Quantisnow

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2025-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project