logo

Greenpeace Belgium HQ / archipelago

Sector: Commercial • Location: Belgium

Source: ArchDaily

Project
Closed

Text description provided by the architects.The new Greenpeace Belgium HQ is located in a dense building block in the city center ofBrussels. The existing structures used to belong to an old organ atelier, called Manufacture d'Orgues de Bruxelles. To uncover the qualities of the factory building, a process of 'matchmaking' resulted in an innovative approach towards the programming of the new offic

Project Information FAQ

Project Information

3 Q
The project “Greenpeace Belgium HQ / archipelago” is an infrastructure initiative in the Commercial sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The new Greenpeace Belgium HQ is located in a dense building block in the city center ofBrussels. The existing structures used to belong to an old organ atelier, called Manufacture d'Orgues de Bruxelles. To uncover the qualities of the factory building, a process of 'matchmaking' resulted in an innovative approach towards the programming of the new offices: the existing structures, as well as the interior and surrounding climates, were analyzed and matched with specific activities from the Greenpeace team (from formal meetings to wall climbing), resulting in a low-tech project and a high-quality work environment.Match-Making - Low impact environmentally should have a high impact architecturally. The choice to preserve, renovate, and transform is not only critical for the mitigation of embodied carbon, but it also challenges us to play out the phenomenon of incremental bricolage to uncover a great diversity of spaces. Following our aim to match existing structures and energy flows with specific activities, we made some evident choices for the program of the project, like the old organ atelier in the back that becomes the workshop for Greenpeace activists or placing the guest rooms in the row houses in front. However, in between front and back, we designed an elaborate sequence of indoor and outdoor spaces, public and private areas, and more or less conditioned interior climates, providing multiple spatial options for the dynamic and ever-changing organization of Greenpeace.Activity-Based - We started a co-creation process by camping out at the former Greenpeace offices and the Rainbow Warrior ship in Ostend. Next, an activity-based approach led us to identify several work activities at Greenpeace: large meetings, small meetings, informal meetings, focus work, calling, eating, making, and climbing. The sharing of these spaces, by Greenpeace and local organizations, aims to support social interaction and foster a sense of community. In addition to tailoring the program to the needs of Greenpeace, we, therefore, looked at the management of the shared spaces by clustering activities and considering shared facilities as well as important acoustical barriers. In this way, we created a work environment where multiple activities can happen simultaneously and interfere if desired.Sufficiency - We made a careful study of the site at the Vergotedok, located in the rapidly evolving 'canal zone' ofBrussels, and found an interesting mix of atmospheres. Typical Brussels row houses and a hidden warehouse at the back. Open views towards the water and cement silos on the opposite side. Heritage buildings and a hyper-diverse neighborhood. To maintain this mix of atmospheres, a strategy of 'sufficiency' was proposed as the guiding principle for the design of the project. This means that we look first at what is available, in terms of structure and energy, and then look at strategies to use 'just enough' for specific activities taking place in the building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data