logo
ProjectForthcoming

GreenSteam4Paper

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The project GS4P will deploy an electric steam boiler to electrify industrial process heat in the pulp and paper sector. It will produce saturated steam to replace part of the existing natural-gas-based steam generation. The main objective is to reduce CO2 emissions by introducing electrified heat based on grid electricity in a sector with high and continuous heat demand. The project demonstrates

Status
Prospective
Sector
Power Generation (CCGT), Natural Gas, Forest Products and Packaging, Manufacturing (Industrial)
Location
Norway
Updated
19 Nov 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about GreenSteam4Paper

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “GreenSteam4Paper” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Norway. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

forthcoming

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project GS4P will deploy an electric steam boiler to electrify industrial process heat in the pulp and paper sector. It will produce saturated steam to replace part of the existing natural-gas-based steam generation. The main objective is to reduce CO2 emissions by introducing electrified heat based on grid electricity in a sector with high and continuous heat demand. The project demonstrates a cost-efficient and flexible decarbonisation pathway by operating the electric steam boiler in hybrid mode with existing gas boilers and dispatching it based on electricity price signals to ensure economically viable electrification. The project installs 4.95 MWth of new electrified heat capacity and will supply around 5 000 MWhth of steam per year to a paper machine with a total annual demand of 35 500 MWhth. Steam is produced at around 170 °C and 8 bar via an electric steam boiler using a 5 MWe electrical connection integrated into the existing 10 kV grid infrastructure. The system delivers saturated steam to an existing steam header and is measured using real-time metering of electricity consumption, steam flow, temperature, and pressure. The project replaces natural gas-based heat and avoids approximately 1 122 tonnes of CO2 emissions per year. The electric steam boiler operates with high flexibility, modulating output between low and full load, allowing operation during low-price electricity periods. The project supports the Clean Industrial Deal by reducing dependence on fossil fuels and accelerating industrial electrification. It demonstrates the use of electric steam boilers for process heat in the paper industry, where significant decarbonisation potential exists, and can be replicated across similar industrial sites with existing steam systems and grid access. The project is located in Wuppertal, Germany, at an existing paper production facility, where it replaces a natural gas boiler and contributes to reducing industrial emissions while maintaining secure heat supply.

Location

Country

Norway

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Natural Gas, Forest Products and Packaging, Manufacturing (Industrial)

Article published date

2026-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project