Greentree Road Extension
Sector: Waste Processing and Treatment • Location: Chesapeake, Virginia, United States of America
Source: Dodge
This project will extend Greentree Road It will include the acquisition of a new 90 ft. Right-of-Way (ROW) section and a fourlane divided roadway extension of Greentree Road for approximately 0.5 miles between Kempsville Road at Greentree Road to Clearfield Ave. at Discovery Drive. The new roadway will include new traffic signals at the intersection to Clearfield Ave., a right turn lane on Clearfi
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government
- Location
- Chesapeake, Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Greentree Road Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project will extend Greentree Road It will include the acquisition of a new 90 ft. Right-of-Way (ROW) section and a fourlane divided roadway extension of Greentree Road for approximately 0.5 miles between Kempsville Road at Greentree Road to Clearfield Ave. at Discovery Drive. The new roadway will include new traffic signals at the intersection to Clearfield Ave., a right turn lane on Clearfield Ave. westbound, a no-signal connection at Ian Way, a traffic signal modification at Kempsvill... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Chesapeake |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
