GREENWOOD DRIVE @ LITTLE TENNESSEE RIVER
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
Bridge Replacement of Greenwood Drive at Little Tennessee River. This 1987 bridge is deficient and requires posting due to insufficient load carrying capacity. Sub’s abutments exhibit voids and the beginning of enroll settlement. The steel pile bents display moderate to heavy rust/pitting with those in the water zone exhibiting section loss in the flange and webbing; Super’s concrete box beams e
- Status
- Under Construction
- Sector
- Water Supply and Storage, Cement, Bridge, Steel, Government, Metal
- Location
- Dillard, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about GREENWOOD DRIVE @ LITTLE TENNESSEE RIVER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge Replacement of Greenwood Drive at Little Tennessee River. This 1987 bridge is deficient and requires posting due to insufficient load carrying capacity. Sub’s abutments exhibit voids and the beginning of enroll settlement. The steel pile bents display moderate to heavy rust/pitting with those in the water zone exhibiting section loss in the flange and webbing; Super’s concrete box beams exhibit spalls, light efflorescence, hairline cracking, exposed steel and there is minor misalignment. Concrete deck shows minor scaling with all joints impacted by debris. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Dillard |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Bridge, Steel, Government, Metal |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
