logo

Gregoire Lake Provincial Park Sanitary & Electrical Upgrades

Sector: Water Supply and Storage • Location: Edmonton, Alberta, Canada

Source: Dodge USA

Project
Closed

Work of this Contract comprises the following: .1 Provide the distribution of sanitary forcemain services throughout Gregoire Lake Provincial Park. .2 Provide septic system installation to align and comply with the Alberta Private Sewage System, 2021 Standard. .3 Provide new cisterns, sceptic tanks and pumps to upgrade existing infrastructure and provide the connection to the new sanitary systems.

Status
Closed
Sector
Water Supply and Storage, Car parking, Power Generation (CCGT), Waste Processing and Treatment, Automotive, Commercial
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Gregoire Lake Provincial Park Sanitary & Electrical Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gregoire Lake Provincial Park Sanitary & Electrical Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work of this Contract comprises the following: .1 Provide the distribution of sanitary forcemain services throughout Gregoire Lake Provincial Park. .2 Provide septic system installation to align and comply with the Alberta Private Sewage System, 2021 Standard. .3 Provide new cisterns, sceptic tanks and pumps to upgrade existing infrastructure and provide the connection to the new sanitary systems. .4 Provide electrical upgrades to upgrade existing infrastructure and provide the connection to ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Power Generation (CCGT), Waste Processing and Treatment, Automotive, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project