logo
ProjectPlanned

Grenada 15 MW Geothermal Project

Planned · Grenada · Last reported Jan 2033

Source: Winn FM

A planned 15 MW geothermal project in Grenada aiming to start generating power in 2033 and supply every household at 2024 consumption levels. The project relies on grant financing for exploration and is sized based on current demand and resource confirmation.

Status
Prospective
Sector
Geothermal, Power Generation (CCGT)
Location
Grenada
Updated
22 Jul 2026
Source
Winn FM

ConstructChat

Ask ConstructChat about Grenada 15 MW Geothermal Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Grenada 15 MW Geothermal Project” is an infrastructure initiative in the Geothermal sector, located in Grenada. Taiyo aggregates data on it from Winn FM.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A planned 15 MW geothermal project in Grenada aiming to start generating power in 2033 and supply every household at 2024 consumption levels. The project relies on grant financing for exploration and is sized based on current demand and resource confirmation.

Original sector

Energy

Location

Country

Grenada

Source

Source

Winn FM

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT)

Article published date

2025-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project