Grenoble Tramway
Signed · France
Source: European Investment Bank (EIB)
The project consists of the construction of two new lines (C and C’) for Grenoble's tramway network along with the supply of the rolling stock and additional equipment required for their commissioning. The double-track line serving 22 new stations will be 11.7 km long and feature a new depot and various improvements to the urban environment.
- Status
- Under Construction
- Sector
- Cable car, Government, Automotive
- Location
- France
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Grenoble Tramway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of two new lines (C and C’) for Grenoble's tramway network along with the supply of the rolling stock and additional equipment required for their commissioning. The double-track line serving 22 new stations will be 11.7 km long and feature a new depot and various improvements to the urban environment. |
Original sector | Transport |
Location
Country | France |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Cable car, Government, Automotive |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
