logo
ProjectCompleted

Grey Road 30 Stormwater Management Study

Completed · Ontario

Source: Infrastructure Canada

Grey Road 30 is located at the floor of the Beaver Valley. The road has previously flooded causing increased maintenance costs. Grey is going to have a consultant complete a drainage study and establish multiple outlets to the Beaver River.

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Grey Road 30 Stormwater Management Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Grey Road 30 Stormwater Management Study” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Grey Road 30 is located at the floor of the Beaver Valley. The road has previously flooded causing increased maintenance costs. Grey is going to have a consultant complete a drainage study and establish multiple outlets to the Beaver River.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project