Grid 647 Bridge Replacement
Closed · Saskatchewan · Last reported Sep 2023
Source: Dodge USA
Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Steel, Waste Processing and Treatment, Government, Road, Metal, Commercial
- Location
- Cabri, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grid 647 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Cabri |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Steel, Waste Processing and Treatment, Government, Road, Metal, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
