logo
ProjectClosed

Grid 647 Bridge Replacement

Closed · Saskatchewan · Last reported Sep 2023

Source: Dodge USA

Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian.

Status
Closed
Sector
Water Supply and Storage, Bridge, Steel, Waste Processing and Treatment, Government, Road, Metal, Commercial
Location
Cabri, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Grid 647 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Grid 647 Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Cabri, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian.

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Cabri

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Steel, Waste Processing and Treatment, Government, Road, Metal, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project