Grid 647 Bridge Replacement
Sector: Water Supply and Storage • Location: Cabri, Saskatchewan, Canada
Source: Dodge USA
Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Removal and Disposal of a Short-span Bridge and the Supply and Installation of Three 2200 Mm Corrugated Steel Pipe Culvert by Open Excavation on Grid 647 Over Smith Creek in the Rm of Lacadena, in NNe 28-23-15 West of 3rd Meridian. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
