Grid connection of Lai Chau hydropower plant

Sector: Hydro • Location: Vietnam

Source: KFW Bank aus Verantwortung

Project
Completed

The project involves financing the grid connection of the Lai Chau hydroelectric power plant on the Black River (Song Da) in northern Vietnam. For this purpose, a 160 km long 500 kV high-voltage transmission line will be built from Lai Chau to Son La and the switchgear in Son La will be expanded accordingly. The Lai Chau HPP (1,200 MW) currently under construction will be connected to the Vietname

Project Information FAQ

Project Information

5 Q
The project “Grid connection of Lai Chau hydropower plant” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves financing the grid connection of the Lai Chau hydroelectric power plant on the Black River (Song Da) in northern Vietnam. For this purpose, a 160 km long 500 kV high-voltage transmission line will be built from Lai Chau to Son La and the switchgear in Son La will be expanded accordingly. The Lai Chau HPP (1,200 MW) currently under construction will be connected to the Vietnamese interconnected grid in order to supply load centers primarily in the north and center of the country. The construction of the Lai Chau hydroelectric power plant is not subject to FC financing, but is considered an associated project, particularly with regard to environmental and social aspects. The project is being carried out by the state-owned Vietnamese electricity supplier EVN and EVN's transmission network subsidiary National Power Transmission Company (NPT). Based on the signed supply and service contracts, we estimate the total cost of the line construction including the expansion of the switchgear at the equivalent of around EUR 115 million. These will be financed through a development loan, a promotional loan and the partner's own contribution. In addition, we are allocating funds for an ongoing accompanying measure to ensure the environmental and social compatibility of the construction and operation of the Lai Chau HPP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data