logo

Grid connection of solar complex NOOR Midelt

Sector: Commercial • Location: Morocco

Source: KFW Bank aus Verantwortung

Project
Active

The measure provides for the financing of the grid connection for the first phase (NOOR Midelt I and II) of the NOOR Midelt solar complex. The solar power plants are to be connected to the El Ouali substation via a 400 kV transmission line. For this purpose, a 225 kV switchgear is being built near the site of the solar complex. This switchgear will connect the complex to the national high-voltage

Project Information FAQ

Project Information

5 Q
The project “Grid connection of solar complex NOOR Midelt” is an infrastructure initiative in the Commercial sector, located in Morocco. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The measure provides for the financing of the grid connection for the first phase (NOOR Midelt I and II) of the NOOR Midelt solar complex. The solar power plants are to be connected to the El Ouali substation via a 400 kV transmission line. For this purpose, a 225 kV switchgear is being built near the site of the solar complex. This switchgear will connect the complex to the national high-voltage grid via two power transmission lines. The expansion of the existing 225 kV El Ouali substation is also planned. The borrower is the Moroccan Agency for Sustainable Energy, MASEN. However, the state-owned utility company ONEE (Office National de lElectricité et de lEau Potable) will be responsible for preparation, tendering and implementation as the project sponsor, as it has sovereignty over the transmission networks and has the necessary expertise. After completion, ONEE, as the network operator, will also own the line and be responsible for its operation. The FC module will enable the renewable energy generated by the NOOR Midelt solar complex to be fed into the national electricity grid, thereby contributing to addressing the core challenges in the Moroccan energy sector. The electricity produced by the solar complex will cover the electricity consumption of around 1.5 million people and avoid emissions of at least 700,000 tons of CO2 per year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data