logo

Grid Storage Launchpad (GSL) Utility-Scale Battery Testing Facility

Sector: Power Transmission • Location: Washington, USA

Source: Energy-Storage.News

Project
Under Construction

The Pacific Northwest National Laboratory (PNNL) has begun utility-scale battery testing at the Grid Storage Launchpad (GSL) facility in Washington. The facility can test and validate batteries up to 100kW, suitable for grid-scale applications. Construction began in 2022 with a cost of US$75 million. The first battery tested is a vanadium redox flow battery by Invinity Energy Systems.

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT), Energy Storage, Government
Location
Washington, United States of America
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Grid Storage Launchpad (GSL) Utility-Scale Battery Testing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Grid Storage Launchpad (GSL) Utility-Scale Battery Testing Facility” is an infrastructure initiative in the Power Transmission sector, located in Washington, USA. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Pacific Northwest National Laboratory (PNNL) has begun utility-scale battery testing at the Grid Storage Launchpad (GSL) facility in Washington. The facility can test and validate batteries up to 100kW, suitable for grid-scale applications. Construction began in 2022 with a cost of US$75 million. The first battery tested is a vanadium redox flow battery by Invinity Energy Systems.

Original sector

Energy Storage

Budget

Location

Country

United States of America (USA)

State

Washington

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Energy Storage, Government

Article published date

2025-12-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project