GRITA 2 Subsea Power Link
Planned · Lecce (Italy) · Last reported May 2025
GRITA 2 is a new high-voltage direct current (HVDC) electrical interconnection project between Italy and Greece. It involves a subsea cable approximately 300 kilometers long, including 240 kilometers undersea at depths up to 1,000 meters, with a transmission capacity of up to 1,000 MW. The project complements an existing 500 MW interconnection operational since 2002 and includes construction of a
- Status
- Prospective
- Sector
- Energy
- Location
- Melendugno and Galatina (Italy), Lecce (Italy), Italy and Greece
- Updated
- 19 Nov 2026
- Source
- Portnews
ConstructChat
Ask ConstructChat about GRITA 2 Subsea Power Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | GRITA 2 is a new high-voltage direct current (HVDC) electrical interconnection project between Italy and Greece. It involves a subsea cable approximately 300 kilometers long, including 240 kilometers undersea at depths up to 1,000 meters, with a transmission capacity of up to 1,000 MW. The project complements an existing 500 MW interconnection operational since 2002 and includes construction of a converter station in Galatina and subsea cable landfall in Melendugno, Italy. |
Original sector | Energy |
Budget |
Location
Country | Italy and Greece |
State | Lecce (Italy) |
City | Melendugno and Galatina (Italy) |
Source
Source | Portnews |
URL |
More Details
Record type | Project |
Article published date | 2025-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
