Grosse Ile WWTP Pump Replacement
Closed · Michigan · Last reported Jul 2024
Source: Dodge USA
Remove and Replace Lime Slurry Pump Contractor shall Remove and Replace one (1) Existing Lime Slurry Pump with new Seepex Standard Progressive Cavity Lime Slurry Pump with Block Design, Model BN 10-12, with 10 USGPM conveying capacity 160 lb.ft flooded suction, 40 psi pressure, 84rpm speed, mounted horizontally, or approved equal, this item includes all labor, materials, equipment, removal of exis
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Water Supply and Storage
- Location
- Grosse Ile Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grosse Ile WWTP Pump Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove and Replace Lime Slurry Pump Contractor shall Remove and Replace one (1) Existing Lime Slurry Pump with new Seepex Standard Progressive Cavity Lime Slurry Pump with Block Design, Model BN 10-12, with 10 USGPM conveying capacity 160 lb.ft flooded suction, 40 psi pressure, 84rpm speed, mounted horizontally, or approved equal, this item includes all labor, materials, equipment, removal of existing lime slurry pump, disposal, wiring, electrical, piping, flanges, fittings, reducers, basepla... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grosse Ile Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Water Supply and Storage |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
